Français
Griffon d’Or trophy (2009-10-13)
Saramac is nominated in the city of Terrebonne, for a Griffon d’Or trophy in the category "environment". The company is the first one in the country of des Moulins, to obtain the certification ISO 14001 environmental management.
www.galadugriffondor.com

Centura / Ville St-Laurent (2009-10-13)
A beautiful building has just been completed using sandwich panels with insulation. This project is currently in process for obtaining a LEED certification.
View pictures

Building Louvain (2009-10-13)
More than 200 panels have been installed in record time. This important building will have a significant architectural impact in its environment.
View pictures

Saramac Inc... (2009-07-07)
Saramac Inc completed last June, the installation of the project located at 316, 11th Avenue in New York, with the contractor Levine Builders within the prescribed times. Congratulations for their 30th anniversary.
View pictures

MercadOr 2009... (2009-06-05)
Saramac gaines a mercadOr 2009 for these innovative practices in humain ressources management, for the creation of a school of formation specifically dedicated to the realization of architectural concrete products.
Read more

Louis-Bohème project... (06-05-2009)
The Louis-Bohème project, located in the new "Quartier des spectacles" is presently in installation.
Louis-Bohème

Canadian conference... (04-30-2009)
Saramac is proud to take part in the 12th Canadian Conference on Science & Technology of the Building to the Palais des Congrès from May 6th to May 8th 2009.
www.cebq.org

Articles published... (04-22-2009)
Articles published in the magazine Inno concerning Saramac and the prestigious project, Sir George Simpson.
View the articles

Panel installation... (03-30-2009)
Panel installation for the Swatow project in Montréal’s Chinatown is under way.
Swatow

Currently in activity... (03-30-2009)
Here are the projects currently in activity to the United States: 1510 LEXINGTON AVENUE. N.Y., 839 6TH AVENUE N.Y. et 316 11th AVENUE N.Y.