Project information

Location:        Montreal 
         
Owner:       PJCCBI
         
Architect:         Mohawk Bridge Consortium
         
Engineer:        SNC-Lavalin
         
Prefabricated components:        1300 prefabricated panels for the apron

Location:        Montreal 
         
Owner:       PJCCBI
         
Architect:         Mohawk Bridge Consortium
         
Engineer:        SNC-Lavalin
         
Prefabricated components:        1300 prefabricated panels for the apron

DESCRIPTION

The deck of the bridge was replaced in full, panel by panel, mainly at night allowing the bridge to keep alternately 2 or 4 lanes open 24/7.

Prefabricated concrete has the advantage of being quick to install and allows faster opening of lanes in addition to meeting safety criteria and a life expectancy of 75 years.

The deck of the bridge was replaced in full, panel by panel, mainly at night allowing the bridge to keep alternately 2 or 4 lanes open 24/7.

Prefabricated concrete has the advantage of being quick to install and allows faster opening of lanes in addition to meeting safety criteria and a life expectancy of 75 years.

Photos