PROJECT information

Location: Laval 
  
Duration of construction: 24 weeks of production and 60 days of installation
  
Owner:The Cadillac Fairview Corporation.
  
Architect: Groupe Archifin
  
Engineer: Dessau-Soprin / Hybrid Parking Solutions, LLC
  
Contractor: Construction C.A.L.
  
Prefabricated components: 3 levels above ground including:
 ● 75 columns
 ● 183 internal beams
 ● 564 double T for 388 346 square feet
 ● 120 exterior spandrels for 29 100 square feet

Location: Laval 
  
Duration of construction: 24 weeks of production and 60 days of installation
  
Owner:The Cadillac Fairview Corporation.
  
Architect: Groupe Archifin
  
Engineer: Dessau-Soprin / Hybrid Parking Solutions, LLC
  
Contractor: Construction C.A.L.
  
Prefabricated components: 3 levels above ground including:
 ● 75 columns
 ● 183 internal beams
 ● 564 double T for 388 346 square feet
 ● 120 exterior spandrels for 29 100 square feet

DESCRIPTION

Serving a major shopping center in Laval, the objective was to capitalize on additional parking spaces while minimizing the impact on the day-to-day operations of the center. It was also the concern of owners and designers to visually marry the new structure to the existing one. This signature was very successful.

This project gave rise to a structural innovation by creating niches in the spandrel-beams to embed the legs of double T.

Serving a major shopping center in Laval, the objective was to capitalize on additional parking spaces while minimizing the impact on the day-to-day operations of the center. It was also the concern of owners and designers to visually marry the new structure to the existing one. This signature was very successful.