Project information

Location: Longueil
  
Duration of construction: 2 months of production and 2 months of installation
  
Owner:Hôpital Charles-Lemoyne
  
Architect: Les Architectes Daoust-Boutros + Pratte en consortium
  
Engineer: Dessau-Soprin
  
Contractor: GC Progère
  
Prefabricated components: 500 spaces on 3 levels including:
 ● 35 columns for 1 211 linear feet
 ● 50 interior beams for 1 131 linear feet
 ● 184 double T for 128 201 square feet
 ● 99 exterior spandrels for 22 413 square feet

Location: Longueil
  
Duration of construction: 2 months of production and 2 months of installation
  
Owner:Hôpital Charles-Lemoyne
  
Architect: Les Architectes Daoust-Boutros + Pratte en consortium
  
Engineer: Dessau-Soprin
  
Contractor: GC Progère
  
Prefabricated components: 500 spaces on 3 levels including:
 ● 35 columns for 1 211 linear feet
 ● 50 interior beams for 1 131 linear feet
 ● 184 double T for 128 201 square feet
 ● 99 exterior spandrels for 22 413 square feet

Description

Structure on 3 levels annexed to the hospital to increase the volume of parking spaces.

Speed, efficiency and safety as well as low maintenance tipped the balance for this system.

Structure on 3 levels annexed to the hospital to increase the volume of parking spaces.

Speed, efficiency and safety as well as low maintenance tipped the balance for this system.