PROJECT information

Project size:

PLATOPOLIS - Plateau City Complex - is a four-phase project consisting of 4 separate buildings ('A', 'B', 'C' and 'D') with 4 floors for a total of 196 condos. The first phase covered an area of 68 888 square feet, including an underground parking lot, each floor offering 16,000 square feet.

  
Location: Montréal
  
Owner:Le Groupe Gabriel 
  
Architect: Montreal Zone Design 
  
Engineer: HGS Limited, Consulting Engineers 
  
Contractor: Fadi Coussa 
  
Prefabricated components: Products used by building:
 ● 878 slabs for 75 000 square feet
 ● 77 balconies for 6 000 square feet
 ● 230 architectural, structural and sandwich walls for 32 319 square feet

Project size:

PLATOPOLIS - Plateau City Complex - is a four-phase project consisting of 4 separate buildings ('A', 'B', 'C' and 'D') with 4 floors for a total of 196 condos. The first phase covered an area of 68 888 square feet, including an underground parking lot, each floor offering 16,000 square feet.

  
Location: Montréal
  
Owner:Le Groupe Gabriel 
  
Architect: Montreal Zone Design 
  
Engineer: HGS Limited, Consulting Engineers 
  
Contractor: Fadi Coussa 
  
Prefabricated components: Products used by building:
 ● 878 slabs for 75 000 square feet
 ● 77 balconies for 6 000 square feet
 ● 230 architectural, structural and sandwich walls for 32 319 square feet

Description

The owner has decided to use the total precast concept of prefabrication because the production of prefabricated components during the permitting and / or site preparation process saves time, resulting in rapid and efficient construction regardless of weather conditions . After only twelve months from the start of construction, the building was handed over to the Condominium Syndicate, which allowed the builder to recover his money and start building another one.

Concrete construction (soundproofing), lifts (accessibility), well-designed green spaces (courtyard), private inner courtyard, safe bike space and easy access indoor parking are amongst the "most sought after" elements in the neighborhood.

The owner has decided to use the total precast concept of prefabrication because the production of prefabricated components during the permitting and / or site preparation process saves time, resulting in rapid and efficient construction regardless of weather conditions . After only twelve months from the start of construction, the building was handed over to the Condominium Syndicate, which allowed the builder to recover his money and start building another one.

Concrete construction (soundproofing), lifts (accessibility), well-designed green spaces (courtyard), private inner courtyard, safe bike space and easy access indoor parking are amongst the "most sought after" elements in the neighborhood.

Photos

Système préfabriqué complet - Total precast system - Schokbeton - Saramac