PROJECT information

Location: Ste-Agathe, Laurentides 
  
Duration of construction:  2 weeks of production and 16 hours of installation
  
Owner: Municipality of Ste-Agathe
  
Architect:  Luc Allard Architecte
  
Ingénieur:  Consortium Dessau-Genivar
  
Contractor:  Nordmec Construction Inc.
  
Prefabricated components:  Two structures comprising:
  ● 1st: 7.95 mx 6.55 mx 6.42 m = 16 panels
  ● 2nd: 5.54 mx 3.95 mx 5.57 m = 10 panels

Location: Ste-Agathe, Laurentides 
  
Duration of construction:  2 weeks of production and 16 hours of installation
  
Owner: Municipality of Ste-Agathe
  
Architect:  Luc Allard Architecte
  
Ingénieur:  Consortium Dessau-Genivar
  
Contractor:  Nordmec Construction Inc.
  
Prefabricated components:  Two structures comprising:
  ● 1st: 7.95 mx 6.55 mx 6.42 m = 16 panels
  ● 2nd: 5.54 mx 3.95 mx 5.57 m = 10 panels

DESCRIPTION

The main feature of these buildings is that they are self-supporting. Prefabricated walls and roofs, concrete panels are insulated (sandwich), they are both structure, interior finish and exterior finish, with the exception of the roof that has received an elastomeric membrane. The exterior face of the concrete walls is a reproduction of wood because the architect was mandated to create an industrial building inspired and blends with the surrounding nature in shapes, finishes and colors.

The main feature of these buildings is that they are self-supporting. Prefabricated walls and roofs, concrete panels are insulated (sandwich), they are both structure, interior finish and exterior finish, with the exception of the roof that has received an elastomeric membrane. The exterior face of the concrete walls is a reproduction of wood because the architect was mandated to create an industrial building inspired and blends with the surrounding nature in shapes, finishes and colors.